印度肥婆丰满bbw,污调教贱乳打屁股扒开作文,农场主的女儿们 经典k 8,黑人bbcvideos极品

Welcome to the official website of Wuxi Chenna Machinery Co., Ltd. (Changzhou Chenna Hydraulic Machinery Co., Ltd.)!
LANGUAGE:CNEN
Precision piston rod

Professional Sincere Honest Win-win

HOTLINE:

+86-158 9532 0613

Hydraulic cylinder precautions

First, in order to prevent the bending or deformation of the elongated member such as the piston rod, the balance of the support is applied when placed. During the disassembly, the piston rod top thread, the port thread and the piston rod surface, the inner wall of the cylinder liner, etc. should be prevented from being damaged.

Second, the disassembly should be carried out in order. Due to the different structure and size of the various hydraulic cylinders, the disassembly sequence is slightly different. Generally, the oil in the two chambers of the cylinder should be drained, then the cylinder head should be removed, and the piston and piston rod should be removed. When disassembling the cylinder head of the hydraulic cylinder, special tools should be used for the key or the snap ring of the inner card type connection. It is forbidden to use the flat shovel; for the flange type end cover, it should be screwed out, no hammering or hard smashing is allowed. . When the piston and the piston rod are difficult to extract, do not force it out. You should first find out the cause and then disassemble it.

Third, before and after unloading, try to create conditions to prevent the parts of the hydraulic cylinder from being contaminated by dust and impurities around. For example, when disassembling, try to carry out in a clean environment; after disassembly, all parts should be covered with plastic cloth, not covered with cotton cloth or other work cloth.

Fourth, the cylinder should be carefully checked after disassembly to determine which parts can continue to be used, which parts can be repaired before use, and which parts should be replaced.

Fifth, carefully clean the parts before assembly.

Sixth, when the threaded coupling is tightened, a special wrench should be used, and the torque should meet the standard requirements.

Seventh, after assembling the piston and the piston rod, it is necessary to try to measure whether the concentricity and the straightness over the entire length are out of tolerance.

Eighth, after the assembly, the piston assembly should be moved without any obstruction and uneven resistance.

Ninth, when the hydraulic cylinder is installed on the main machine, a sealing ring should be added between the inlet and outlet port joints and fastened to prevent oil leakage.

2019/09/25 10:12:00 4189 次


Related Documents
Copy right ? 2019 Wuxi Chenna Machinery Co., Ltd.(Changzhou Chenna Hydraulic Machinery Co., Ltd.) All rights reserved.
亚洲精品一区二区三区中文字幕| 中文字幕人妻av一区二区| 亚洲国产成人a片乱码| 全部删除看过的历史记录| xxx少妇厨房xxx乱| 无码人妻少妇久久中文字幕| 国产精品久久久久久久久久久| 国产精品成人国产乱| 亚洲日韩国产成网在线观看| 亚洲精品国产第一综合99久久 | 内射毛片内射国产夫妻| 仙踪林果冻传媒一区二区| 色欲久久久天天天综合网精品| 野の欲求不満な人妻在线| 少妇无码一区二区二三区| 久久久久久精品久久久| 国产午夜成人免费看片无遮挡 | 欧美在线香蕉在线视频| 成人午夜亚洲精品无码网站| 伊人色综合九久久天天蜜桃 | 女人扒开下面无遮挡免费| 国产在线观看国偷精品产拍| 亚洲无线一二三四区手机| 邻居新婚少妇真紧| 24小时在线看免费观看直播| 男女裸体做爰爽爽全过程| 成人午夜爽爽爽免费视频| 国内精品视频一区二区三区 | 丰满多毛的大隂户乱| 97精品国产97久久久久久免费| 亚亚洲精品黑人巨大在线播放| 9 1免费版下载安装| 放荡的小峓子在厨房伦理| 亚洲欧美人成无码苍井空| 女人和公豬交内谢| 男人j桶进女人p无遮挡全过程| 97精品超碰一区二区三区| 99久久国产极品蜜臀av酒店| 成人毛片一区二区| 久久精品国产精品亚洲蜜月 | yd双性学生授乳荡奶头|